Vessel Utilisation – Part 4: An overview of bespoke post processing
Introduction So far in this series we have prepared and run a number of simulations and considered the results in Mermaid, all with the aim of answering the question: “When should we take the trenching vessel on hire, relative to the installation vessel?” We saw in the last post that our base case offset (32 days)[…]