Analysing Wind Farm Foundation Installation – Part 4: Improve Performance – Split Installation

In the last post in this series we identified that even with a larger carrying capacity, our work force was still unable to fully exploit the preferable summer weather and that all start options performed at least some work during the winter.  In this post we’re looking at splitting our installation process into two halves.

The Simulation

To see if we can gain a performance improvement by better exploiting the summer season we are going to install the foundations in two batches of 36.  Read more >